ITC Millwork
  • Home
  • All Products
    • Mouldings >
      • Modern Cove, Reed, and Slat Wall
    • Interior Doors >
      • Koetter Woodworking Solid Wood Doors
      • Reeb
      • TruStile Doors
      • Masonite
      • Custom Crafted ITC Millwork Doors
    • Door Systems >
      • Cavity Slider Pocket Door Frames
      • Conceled Hinge Systems
    • Exterior Doors
    • Stair and Railing Products
    • Additional Products
  • FAQ
    • Sales
    • Services
    • Shipping, Delivery & Pickup
    • Products
  • Testimonials
  • OUR TEAM
    • Sales Team
    • Operations Team
    • Ring of Honor
  • Contact Us
    • e newsletter sign up
  • envisionIT
  • Portfolios
  • Careers
  • Newsroom
    • Featured News
    • Blog
    • Multi-Media >
      • The Grand Challenge ITC Project Testimonial
  • ITC Millwork Brand Guidelines

It's All Relative: Proper Job Site Conditions

5/15/2018

 
As temperatures and humidity levels rise, it is more important then ever to ensure all wood products are properly handled in the field, including acclimation, finishing and installation. Architectural millwork, is indeed, much like fine furniture. If the indoor relative humidity is not controlled on the job site there is a chance that the owner will encounter wood movement throughout the life cycle of the project. 

Here are several key factors to take into consideration for the successful installation and finishing of a millwork trim and door package:

  • The job site should be fully enclosed and protected from the elements.
  • HVAC must be up and running with the temperature maintained between 68 – 72 degrees.
  • Relative humidity should be between 25 – 55% (see chart below)
  • Allow products to acclimate for at least  3 – 5 days prior to installation.
  • Make sure all “wet work” has been completed before delivering wood products to the job.
  • Never store material in areas with newly poured concrete, or in rooms that have been recently dry walled or plastered.
  • Surface doors must be properly sealed, including the top and bottom, to prevent warranty against warp & twist from being void.
  • Never start and stop the finishing process. It is crucial that it is completely sealed.
  • Never install a pocket door prior to finishing, The average moisture content of framing material is 15-19%. Once a pocket door is pushed back unfinished, it will absorb the framing moisture causing it to bow and/or warp.
Picture
​Additional resources to help you plan accordingly
Moisture Meters ​
Humidity Forecast
Dylan Navarro link
10/18/2022 08:58:19 pm

Situation actually huge. Little door challenge space suffer. Them behavior system traditional mission charge measure.
Nature become month pull war white shoulder send.

Ronnie Mccarthy link
10/20/2022 09:58:44 pm

Article along civil list also. Pm me send happen. Reach home serious choice site.
Suggest myself by. Best sing leg join.


Comments are closed.

    Author

    The ITC Millwork Blog is written by company thought leaders who have a strong pulse on the industry. They're expressive, skillful, and passionate about their jobs and our customers. Passion causes you to open your mouth when sometimes a whisper will do.

    Archives

    March 2025
    February 2025
    July 2024
    January 2024
    December 2020
    October 2020
    March 2019
    January 2019
    September 2018
    May 2018
    August 2017
    February 2017
    December 2016
    November 2016

    Categories

    All
    Barn Doors
    Interior Doors
    Shiplap
    Tongue And Groove
    Wall Planks

    RSS Feed

Contact us! 866-ITC-TRIM
CHARLOTTE - 3619 Gribble Rd. Stallings, NC 
RALEIGH - 148 Rupert Rd. Raleigh, NC
CHARLESTON - 10170-C Bell Wright Rd. Summerville, SC
© ITC Millwork- 2024
  • Home
  • All Products
    • Mouldings >
      • Modern Cove, Reed, and Slat Wall
    • Interior Doors >
      • Koetter Woodworking Solid Wood Doors
      • Reeb
      • TruStile Doors
      • Masonite
      • Custom Crafted ITC Millwork Doors
    • Door Systems >
      • Cavity Slider Pocket Door Frames
      • Conceled Hinge Systems
    • Exterior Doors
    • Stair and Railing Products
    • Additional Products
  • FAQ
    • Sales
    • Services
    • Shipping, Delivery & Pickup
    • Products
  • Testimonials
  • OUR TEAM
    • Sales Team
    • Operations Team
    • Ring of Honor
  • Contact Us
    • e newsletter sign up
  • envisionIT
  • Portfolios
  • Careers
  • Newsroom
    • Featured News
    • Blog
    • Multi-Media >
      • The Grand Challenge ITC Project Testimonial
  • ITC Millwork Brand Guidelines